Service
Material Hoists Mounted to Your Scaffold
Carrying material up ladders costs more hours than most schedules admit. A hoist on the scaffold moves loads to the working lift and gives the crane back to the trades that need it.
- Mounted and tied into the scaffold we install
- Sized to the load and the number of daily cycles
- Landing gates at the lifts your crews actually work from
- Installed, maintained and struck under the same contract
Get a hoist estimate
Send drawings, specs or a few photos. We come back in one to three business days.
When a hoist beats crane time
A scaffold-mounted material hoist is a powered platform that runs up the face of the scaffold and lands material at the working lift. It pays for itself on jobs with many small load cycles a day — restoration, envelope and interior fit-out — where booking crane days for repeated lifts is slower and more expensive than a hoist that is already on site.
What the job includes
Everything below runs under the same contract as the scaffolding hoist.
Sizing
We match the hoist capacity to your heaviest regular load and to how many cycles a day the schedule needs.
Mounting and ties
The hoist mast ties into the scaffold structure, which is designed for that load from the start rather than adapted later.
Landings
Gates are set at the lifts your crews work from, so material arrives where the work is instead of two levels below it.
Service through the job
The hoist stays maintained while it is on site and comes down with the scaffold.
Where it fits
Anywhere the same load goes up more than a few times a day.
Mid-rise restoration
Membrane, sealant and window units moving to the working lift all day.
Interior fit-out
Material to floors where the elevators are not available to trades.
Tight sites
Downtown footprints where there is no room or permit window for repeated crane picks.
Questions we get
What contractors ask before booking scaffolding hoist.
Can the hoist carry people?
That depends on the unit and the configuration. Tell us what you need it for and we will tell you what can be put on the site, subject to a site assessment.
Do you install a hoist on its own?
The hoist mounts to and is tied into the scaffold, so it comes with the access package rather than as a standalone drop-off.
How fast can it be on site?
It goes up with the scaffold. If the access is already standing, the schedule depends on the tie design and the unit — call the office and we will give you a real date.
Often booked together
One contract and one crew covers more than one of these on the same site.
Need scaffolding hoist on your site?
Send drawings or a site address and we will come back with an estimate in one to three business days.




