Service
Shoring Systems for Slabs, Beams and Excavations
Shoring holds the load while the permanent structure is not ready to. We size it to the pour schedule and the actual load, not to whatever was on the truck.
- Shoring posts, I-beam shoring, U-heads and screw jacks
- H-frames, aluminum and steel beams, drophead systems
- Slab formwork supports sized to the pour
- Supplied and installed by the crew that designed the layout
Get a shoring estimate
Send drawings, specs or a few photos. We come back in one to three business days.
What shoring systems do
Shoring is temporary structural support that carries load a permanent structure cannot yet carry, or can no longer carry. On new construction that means slab formwork support and reshoring through the pour cycle. On existing buildings it means holding a slab, beam or wall while it is repaired, cut into or replaced. The layout follows the load path and the schedule, which is why it is designed rather than improvised.
What the job includes
Everything below runs under the same contract as the shoring systems.
Load and layout
We work from the loads and the pour or demolition sequence, then set post spacing and beam runs to match.
Supply and install
Posts, frames, beams, U-heads, screw jacks and drophead systems, installed by our crew.
Reshoring
Sequenced strip and reshore that keeps the young slab supported without stalling the cycle.
Strike
Shoring comes out on the schedule agreed at the start, and we take it away.
Where it fits
Two very different jobs use the same kit.
Cast-in-place construction
Slab formwork support and reshoring through a multi-floor pour cycle.
Structural alteration
Holding a slab or beam while an opening is cut, a column is moved or a member is replaced.
Excavation support
Temporary support around excavations where the surrounding structure needs holding.
Questions we get
What contractors ask before booking shoring systems.
Do you design the shoring layout?
We work from the loads and the sequence and set the layout to suit. Where the job needs stamped drawings, that goes through engineering before anything is installed.
Can you shore and scaffold the same site?
Yes, and that is usually the cheaper way to run it — one contract, one crew, one point of responsibility for both.
How long can shoring stay in?
For as long as the structure needs it. Duration is agreed up front and written into the contract with the install.
Often booked together
One contract and one crew covers more than one of these on the same site.
Need shoring systems on your site?
Send drawings or a site address and we will come back with an estimate in one to three business days.




