Skip to content
A&K Scaffolding & Shoring Systems

Service

Shoring Systems for Slabs, Beams and Excavations

Shoring holds the load while the permanent structure is not ready to. We size it to the pour schedule and the actual load, not to whatever was on the truck.

  • Shoring posts, I-beam shoring, U-heads and screw jacks
  • H-frames, aluminum and steel beams, drophead systems
  • Slab formwork supports sized to the pour
  • Supplied and installed by the crew that designed the layout

Get a shoring estimate

Send drawings, specs or a few photos. We come back in one to three business days.

Photos or drawings of your object
Drop files here or browsePhotos, PDFs or CAD drawings. Up to 5 files, 20 MB each.

We use your details to prepare the estimate and get back to you, nothing else. See the privacy policy.

What shoring systems do

Shoring is temporary structural support that carries load a permanent structure cannot yet carry, or can no longer carry. On new construction that means slab formwork support and reshoring through the pour cycle. On existing buildings it means holding a slab, beam or wall while it is repaired, cut into or replaced. The layout follows the load path and the schedule, which is why it is designed rather than improvised.

What the job includes

Everything below runs under the same contract as the shoring systems.

Load and layout

We work from the loads and the pour or demolition sequence, then set post spacing and beam runs to match.

Supply and install

Posts, frames, beams, U-heads, screw jacks and drophead systems, installed by our crew.

Reshoring

Sequenced strip and reshore that keeps the young slab supported without stalling the cycle.

Strike

Shoring comes out on the schedule agreed at the start, and we take it away.

Where it fits

Two very different jobs use the same kit.

Cast-in-place construction

Slab formwork support and reshoring through a multi-floor pour cycle.

Structural alteration

Holding a slab or beam while an opening is cut, a column is moved or a member is replaced.

Excavation support

Temporary support around excavations where the surrounding structure needs holding.

Questions we get

What contractors ask before booking shoring systems.

Do you design the shoring layout?

We work from the loads and the sequence and set the layout to suit. Where the job needs stamped drawings, that goes through engineering before anything is installed.

Can you shore and scaffold the same site?

Yes, and that is usually the cheaper way to run it — one contract, one crew, one point of responsibility for both.

How long can shoring stay in?

For as long as the structure needs it. Duration is agreed up front and written into the contract with the install.

Need shoring systems on your site?

Send drawings or a site address and we will come back with an estimate in one to three business days.

778 375 5349Get an Estimate